SPRSP91C February 2023 – November 2025 AM68 , AM68A
PRODUCTION DATA
Refer to the PDF data sheet for device specific package drawings
| NO. | MIN | MAX | UNIT | ||
|---|---|---|---|---|---|
| T1 | tw(HWnTSPUSHH) | Pulse duration, HWnTSPUSH(2) high | 12P + 2(1) | ns | |
| T2 | tw(HWnTSPUSHL) | Pulse duration, HWnTSPUSH(2) low | 12P + 2(1) | ns | |
| T3 | tc(RFT_CLK) | Cycle time, RFT_CLK | 5 | 8 | ns |
| T4 | tw(RFT_CLKH) | Pulse duration, RFT_CLK high | 0.45 * T(3) | ns | |
| T5 | tw(RFT_CLKL) | Pulse duration, RFT_CLK low | 0.45 * T(3) | ns | |
Figure 6-100 CPTS
Timing Requirements