SLUUD44 June   2025 UCC57142

 

  1.   1
  2.   Description
  3.   Features
  4.   4
  5. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  6. 2Hardware
    1. 2.1 Additional Images
    2. 2.2 Power Requirements
    3. 2.3 Setup for Different UCC57142 Variants
    4. 2.4 I/O Description
    5. 2.5 Jumper Information
    6. 2.6 DBV Package Compatibility
      1. 2.6.1 UCC27511 Modification
      2. 2.6.2 UCC27517 and UC27533 Modification
        1. 2.6.2.1 UCC27518, UCC27519, UCC27536, and UCC27537 Modification
      3. 2.6.3 UCC27531 and UCC27532 Modification
      4. 2.6.4 UCC44273 Modification
  7. 3Implementation Results
    1. 3.1 Equipment Setup
      1. 3.1.1 Power Supply
      2. 3.1.2 Function Generator
      3. 3.1.3 Oscilloscope
      4. 3.1.4 Digital Multimeter (DMM)
    2. 3.2 Bench Setup
    3. 3.3 Procedure and Results
    4. 3.4 Typical Performance Waveforms
      1. 3.4.1 Normal Operation
      2. 3.4.2 Overcurrent Protection Feature
  8. 4Hardware Design Files
    1. 4.1 Schematic
    2. 4.2 PCB Layouts
    3. 4.3 Bill of Materials (BOM)
  9. 5Compliance Information
  10. 6Additional Information
    1. 6.1 Trademarks

Bench Setup

Follow the connection procedure below and Figure 3-1 can be used as a reference.

  • Make sure all the output of the function generator, and voltage source are off before connection.
  • Function generator Ch-A channel applied on IN_IN.
  • Power Supply:
    • Power supply #1: positive node connected to input of DMM #1 and DMM #1 output connected to test point marked as VCC, negative node of Power Supply #1 connected directly to test point marked as GND.
    • Power supply #2: negative node connected to OCP_IN and positive node connected to GND or GND_IO (whichever is more convenient), this makes it so OCP_IN sees -5V­, not 5V.
  • Oscilloscope:
    • VDD Signal: Connect oscilloscope Ch-1 probes to test points marked as VDD to GND, smaller measurement loop is preferred.
    • IN Signal: Connect oscilloscope Ch-2 probes to test points marked as IN to GND, smaller measurement loop is preferred.
    • OUT Signal: Connect oscilloscope Ch-3 probes to test points marked as GATE to GND, smaller measurement loop is preferred.
    • FLTb Signal: Connect oscilloscope Ch-4 probes to test points marked as EN/FLT to GND, smaller measurement loop is preferred.
UCC57142EVM Bench Setup Diagram Figure 3-1 Bench Setup Diagram