DLPU040C October 2016 – July 2024
This section describes indicators that verify proper function of the DLPLCRC410EVM Controller Board. Figure 3-6 shows the controller board indicator locations.
Figure 2-6 DLPLCRC410EVM Controller Board
Indicators