SBAU431 July 2024 ADS1282
Figure 5-4 PCB Layout for the ADS1282EVM (Top Layer)
Figure 5-5 PCB Layout for the ADS1282EVM (Internal GND Plane)
Figure 5-6 PCB Layout for the ADS1282EVM (Internal AVSS Plane)
Figure 5-7 PCB Layout for the ADS1282EVM (Bottom Layer)