See Figure 2-1 for typical test setup. The functions of the test point
connections are:
- VINEMI (TP1) - input supply
connection to the EVM
- GND (TP2) - ground connection for
the input supply
- VOUT (TP3) - output connection
for the load
- GND (TP4) - ground connection for
the load
- EN (TP5) - enable signal test
point
- PGOOD (TP6) - Pgood signal test point
- SYNC (TP7) - sync signal input
connection to the EVM (for use with an external clock)
- GND (TP8) - ground connection for
the sync signal
- VOUT (TP9) - sense connection
point for the output voltage
- GND (TP10) - extra ground
connection test point