SPRUJ28F November 2021 – August 2025 AM68 , AM68A , TDA4AL-Q1 , TDA4VE-Q1 , TDA4VL-Q1
HW Power-On Self-Test (POST) tests are hardware tests performed every time the device is powered up, and are executed by hardware prior to ROM code being run. Software can check the HW POST MISR status in CTRL_MMR_WKUP registers. See Device Configuration -> Module Integration -> LBIST for details on modules which are tested by HW POST, and location of status results. Reference Initialization Overview for further details on device boot flow.