JAJSSZ7 February   2024 TUSB211A-Q1

PRODUCTION DATA  

  1.   1
  2. 特長
  3. アプリケーション
  4. 概要
  5. Pin Configuration and Functions
  6. Specifications
    1. 5.1 Absolute Maximum Ratings
    2. 5.2 ESD Ratings
    3. 5.3 Recommended Operating Conditions
    4. 5.4 Thermal Information
    5. 5.5 Electrical Characteristics
    6. 5.6 Switching Characteristics
    7. 5.7 Timing Requirements
    8. 5.8 Typical Characteristics
  7. Detailed Description
    1. 6.1 Overview
    2. 6.2 Functional Block Diagram
    3. 6.3 Feature Description
      1. 6.3.1 High-Speed EQ
    4. 6.4 Device Functional Modes
      1. 6.4.1 Low-Speed (LS) Mode
      2. 6.4.2 Full-Speed (FS) Mode
      3. 6.4.3 High-Speed (HS) Mode
      4. 6.4.4 High-Speed Downstream Port Electrical Compliance Test Mode
      5. 6.4.5 Shutdown Mode
  8. Application and Implementation
    1. 7.1 Application Information
    2. 7.2 Typical Application
      1. 7.2.1 Design Requirements
      2. 7.2.2 Detailed Design Procedure
        1. 7.2.2.1 Test Procedure to Construct USB High-Speed Eye Diagram
          1. 7.2.2.1.1 For a Host Side Application
          2. 7.2.2.1.2 For a Device Side Application
      3. 7.2.3 Application Curves
    3. 7.3 Power Supply Recommendations
    4. 7.4 Layout
      1. 7.4.1 Layout Guidelines
      2. 7.4.2 Layout Example
  9. Device and Documentation Support
    1. 8.1 ドキュメントの更新通知を受け取る方法
    2. 8.2 サポート・リソース
    3. 8.3 Trademarks
    4. 8.4 静電気放電に関する注意事項
    5. 8.5 用語集
  10. Revision History
  11. 10Mechanical, Packaging, and Orderable Information

パッケージ・オプション

デバイスごとのパッケージ図は、PDF版データシートをご参照ください。

メカニカル・データ(パッケージ|ピン)
  • RWB|12
サーマルパッド・メカニカル・データ
発注情報

Application Curves

GUID-42935026-67B0-4014-9589-6916499958B4-low.gif Figure 7-2 Near End Eye Measurement Set-Up With Pre-Channel Cable
GUID-7DA339C2-3B13-4B3D-A75B-4017C595C54B-low.pngFigure 7-3 2 Meter Pre-Channel Without TUSB211A-Q1
GUID-BD935293-877D-4A41-B3FC-D482FA3B3D87-low.pngFigure 7-5 5 Meter Without TUSB211A-Q1
GUID-DC71C13C-CAC2-452D-AEF6-AE6EB5DF9EB6-low.pngFigure 7-7 5 Meter Pre-Channel With TUSB211A-Q1 EQ=2
GUID-73A2302D-1858-4439-BE01-03CBAF5E3929-low.pngFigure 7-4 2 Meter Pre-Channel With TUSB211A-Q1 EQ=1
GUID-74B3BE6F-1711-4754-9A37-9B4052BF6A43-low.pngFigure 7-6 5 Meter Pre-Channel With TUSB211A-Q1 EQ=1
GUID-AA704C29-B2D9-4CA2-95CD-9E06AFA0A0B0-low.gif Figure 7-8 Near End Eye Measurement Set-Up With Post-Channel Cable
GUID-528BE490-5927-45B5-9F4C-E70458AD23E7-low.pngFigure 7-9 1 Meter Post-Channel Without TUSB211A-Q1
GUID-1F833079-B710-49B7-B422-DB20284EF02B-low.pngFigure 7-11 2 Meter Post-Channel Without TUSB211A-Q1
GUID-B026D8E3-209B-4886-9A44-72A505156B90-low.pngFigure 7-13 4 Meter Post-Channel Without TUSB211A-Q1
GUID-8A5B9148-9355-43E0-BCAC-4B81E419304D-low.pngFigure 7-10 1 Meter Post-Channel With TUSB211A-Q1 EQ=0
GUID-91EAD0E6-3509-4465-95DC-55FA9C3CD941-low.pngFigure 7-12 2 Meter Post-Channel With TUSB211A-Q1 EQ=1
GUID-B207137E-6A3C-4A5D-B9DE-64AFAF441484-low.pngFigure 7-14 4 Meter Post-Channel With TUSB211A-Q1 EQ=2