SLVSHQ9 June 2025 TPS65215-Q1
PRODUCTION DATA
The data on the SDA line must be stable during the HIGH period of the clock signal (SCL). In other words, the state of the data line must only be changed when clock signal is LOW.
Figure 6-5 Data Validity Diagram