SNLA371B December   2020  – February 2024 DP83TG720R-Q1 , DP83TG720S-Q1

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. Introduction
  5. Hardware Configuration
    1. 2.1 Schematic
  6. Software Configuration
  7. Testing PMA
    1. 4.1 PMA Testing Procedure
  8. Testing IOP: Link-up and Link-down
    1. 5.1 IOP Testing Procedure
  9. Testing SQI
    1. 6.1 SQI Testing Procedure
    2. 6.2 Mapping SQI with Link Quality
  10. Testing TDR
    1. 7.1 TDR Testing Procedure
  11. Testing EMC/EMI
  12. 10Revision History

Testing IOP: Link-up and Link-down

OA TC12 specifies different PHY level tests to test link-up time, link-down time and link stability. Similar ECU level tests have been highlighted in OA TC8. This section highlights the test sequence used for these IOP tests for PHY level testing and the same can be ported for ECU level tests.

TC12-interoperability tests are carried out by OA compliance test house C&S. To test interoperability of DP83TG720 , C&S tests each of these parameters with DP83TG720 and other 1000BT1 certified PHYs as its link-partners. Each of these parameters are tested for large number of iterations over different temperatures and cable lengths.

Detailed IOP test report from C&S with OA compliant results is available on request.