Start-Up Sequence

Soft start behavior is shown in the following figures.

In the following waveforms, channel 1 in dark blue is load current; channel 3 in purple is output voltage; channel 4 in green is primary current.

GUID-5886C6D0-8A78-44C1-908F-D2D4CD48F219-low.pngFigure 3-11 Soft Start With 400-VDC Input,
0-A Load
GUID-7B48CBD9-54D6-40A0-82E0-E27B3C1D957B-low.pngFigure 3-13 Soft Start With 400-VDC Input, 84-A Load
GUID-58C4E621-E01B-4A1C-95B5-C30A64347B57-low.pngFigure 3-12 Soft Start With 400-VDC Input,
42-A Load