7 Revision History
Changes from Revision B (May 2026) to Revision C (June 2026)
- Changed status of TPS628523CAWDLSRQ1 in WDLS package from preview to
productionGo
Changes from Revision A (May 2025) to Revision B (May 2026)
- Added devices in WDLS package for release to production and in DLS
packages with status "Preview information (not production data)". Moved devices
with "Advance Information" status to release for productionGo
- Added description about how to connect the FB pin on devices with
fixed output voltageGo
Changes from Revision * (February 2025) to Revision A (May 2025)
- Changed the document status from Advance Information to Production
DataGo
- Changed table from Preview Information to Production Data, added
footnote for Advance information and added TPS628523HADLSRQ1Go