SLUUD28 July 2024
To operate the EVM, set jumpers JP1, JP2, JP3, and JP4 to the desired positions per Section 2.1.1. Connect the input supply to MH1 and MH2, between VIN and GND, and connect the load to MH3 and MH4 between VOUT and GND.