SLUUD36A
July 2024 – August 2024
1
Description
Get Started
Features
5
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
1.5
General Texas Instruments High Voltage Evaluation (TI HV EMV) User Safety Guidelines
1.5.1
General Safety Information
2
Hardware
2.1
Board Parameters
2.2
IO and Jumper Descriptions
2.3
Communication Interface Setup
2.3.1
BQSTUDIO using EV2400
2.3.2
TI Charger GUI for USB2ANY
2.4
Equipment
2.4.1
Equipment Set Up
2.4.2
Equipment - Using a CV Load
2.4.3
Equipment Setup - Using a CV Load
3
Hardware Design Files
3.1
Schematic
3.2
PCB Layout
3.3
Bill of Materials
4
Additional Information
4.1
Trademarks
5
Revision History
3.1
Schematic
Figure 3-1
BQ25820EVM Schematic