SLVT250 June   2026

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  7. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
  8. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Short-Circuit and Over-Power Protection
    4. 3.4 Load Transients
    5. 3.5 Start-up Sequence
    6. 3.6 Load Regulation
  9.   Trademarks

Test Setup

When using a USB-C supply, connect the USB-C cable to J1 (USB-C receptable). When using a benchtop DC supply, connect the positive terminal to TP2 (PPHV) and negative terminal to TP3 (GND). The efficiency was tested using a benchtop DC supply. When testing efficiency, add external bulk capacitance close to VIN to avoid ringing effect due to long wires. For this test, 2 × 470μF 35V aluminum electrolytic capacitors were placed in parallel.

PMP23653 Test Setup USB-C Supply Figure 1-1 Test Setup USB-C Supply
PMP23653 Test Setup DC Supply Figure 1-2 Test Setup DC Supply