Use the following steps for enabling the EVM test setup:
- Make sure that Section 2.4 steps have been followed.
- Make sure that Section 3.1 steps have been followed.
- Turn on PS #1:
- Measure → VSYS (SYS-TP19 and PGND-TP21) = 3.70V ±0.2V
Note: Completely disconnect Load #1 from BATTERY connections if different value is seen.