Use the following guidelines to set up and
test the equipment:
- Set power supply #1 for 30V DC, 6A
current limit and then turn off the supply.
- Connect the output of power supply #1 in
series with a current meter to J1 (VIN and PGND).
- Connect a voltage meter across J1 (VIN)
and J1 (PGND).
- Connect load #1 in series with a current
meter to J3 (VBAT and PGND).
- Connect a voltage meter across J3 (VBAT
and PGND).
- Unplug jumper JP19.
- Set 23V at KEPCO load output. Limit KEPCO
to 6A. Use load #1 to power EVM from the VOUT output.
- Connect J5 to the EV2500. Connect J5 to
the I2C PORT 2 on the EV2500.
- Make sure the jumpers are installed as
indicated in IO and Jumper Descriptions.
- Turn on the computer and load #1. Open
the bqStudio software.
- Select Charger and select the
Next button.
- Select
Charger_1_00_BQ25853.bqz on the Select a Target Page.
- After selecting the target device,
select Field View and then select the Read Register button.
- Set WATCHDOG and EN_CHG to disabled.
- In 16 Bit Registers, set ICHG_REG
to 4000mA.
- Set EN_CHG to enabled.
- Turn on power supply #1, measure:
V(J1(VAC)) = 30V ± 0.5V
I(J1(IAC)) = 3.2A ± 0.5A
V(J3(VBAT)) =
23V ± 0.5V I(J3(IBAT)) = 4.0A ±
0.5A
- Set power supply #1 for 23V, measure:
V(J1(VAC)) = 23V ± 0.5V
I(J1(IAC)) = 4.2A ± 0.5A
V(J3(VBAT)) =
23V ± 0.5V I(J3(IBAT)) = 4.0A ±
0.5A
- Set power supply #1 for 15V, measure:
V(J1(VAC)) = 15V ± 0.5V
I(J1(IAC)) = 6.4A ± 0.5A
V(J3(VBAT)) =
23V ± 0.5V I(J3(IBAT)) = 4.0A ±
0.5A