TIDT419
January 2025
1
Description
Features
Applications
1
Test Prerequisites
1.1
Voltage and Current Requirements
1.2
Required Equipment
1.3
Considerations
1.4
Dimensions
1.5
Test Setup
2
Testing and Results
2.1
Efficiency Graphs
2.2
Efficiency Data
2.3
Thermal Images
2.4
Charge Time and Holdup Time
3
Waveforms
3.1
Switching
3.2
Input and Output Voltage Ripple
3.2.1
Buck Converter
3.2.2
Boost Converter
3.3
Load Transients
3.4
Start-up Sequence
3.4
Start-up Sequence
Figure 2-5
and
Figure 3-2
show the buck converter start-up behavior waveforms.
Ch 1: input voltage at J1; Ch 2: output voltage at J2
Figure 3-9
Buck Converter Turn-On, 0A Load
Ch 1: input voltage at J1; Ch 2: output voltage at J2
Figure 3-10
Buck Converter Turn-On, 1A Load