SLAA380B December   2007  – September 2018 MSP430F2616 , MSP430F2617 , MSP430F2618 , MSP430F2619

 

  1.   Migrating From MSP430F16x MCUs to MSP430F261x MCUs
    1.     Trademarks
    2. 1 Comparison of MSP430F1xx and MSP430F2xx Families
    3. 2 Hardware Considerations for MSP430F16x to MSP430F261x Migration
      1. 2.1 Device Package and Pinout
      2. 2.2 Current Consumption
      3. 2.3 Operating Frequency and Supply Voltage
      4. 2.4 Device Errata
    4. 3 MSP430F16x to MSP430F261x Migration – Firmware Considerations
      1. 3.1 CPU and Memory Considerations
        1. 3.1.1 Extended Memory Architecture
        2. 3.1.2 Subroutine Parameter Passing and Stack Frame
        3. 3.1.3 MSP430X Instruction Cycle Count Optimizations
        4. 3.1.4 Device Memory Map
        5. 3.1.5 Information Flash Memory
      2. 3.2 Serial Communication – USART Versus USCI
        1. 3.2.1 UART Mode
        2. 3.2.2 SPI Mode
        3. 3.2.3 I2C Mode
      3. 3.3 Clock System
        1. 3.3.1 LFXT1 and XT2 Oscillators
        2. 3.3.2 Digitally Controlled Oscillator (DCO)
      4. 3.4 Bootloader
      5. 3.5 Interrupt Vectors
      6. 3.6 Beware of Reserved Bits!
      7. 3.7 Timers
      8. 3.8 Analog Comparator
    5. 4 References
  2.   Revision History

MSP430F16x to MSP430F261x Migration – Firmware Considerations

This section outlines important steps to consider when transitioning existing software routines or an entire application to an MSP430F261x device. Even though MSP430F16x and MSP430F261x are code compatible and share many of the same peripherals, it can be said that, in most cases, migration is not as simple as programming the MSP430F16x binary image into an MSP430F261x device. In general, an application needs to be rebuilt on a source-code level (including all referenced code libraries) using the appropriate MSP430F261x device support files such as the header file and the respective linker command file. Doing this is the first step towards a successful migration to an MSP430F261x. The following sections provide more details regarding certain key aspects that need to be considered.