6 Revision History
Changes from Revision * (September 2023) to Revision A (March 2024)
- Updated Connector, Test Point, and Selection Switch Descriptions
sectionGo
- Updated Connectors tableGo
- Updated Test Points tableGo
- Updated S1 and S2 CFG Setting sectionGo
- Added I2C Operation sectionGo
- Updated Test Procedure sectionGo
- Updated Efficiency figuresGo
- Changed schematicGo
- Updated Bill of Materials tableGo