TIDT352 October   2023

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  6. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plots
  7. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Load Transients
    3. 3.3 Start-Up and Shutdown Sequences

Test Setup

Figure 3-15 illustrates the test setup showing input power and output load connections, and output voltage being monitored with a digital voltmeter (DVM).

GUID-20230908-SS0I-GXGJ-0872-Q4NKDFPHSSBW-low.jpg Figure 1-1 Test Setup
GUID-6E6099D3-068D-4BBF-B285-0EA49EDE1751-low.gif