TIDT352 October   2023

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  6. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plots
  7. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Load Transients
    3. 3.3 Start-Up and Shutdown Sequences

Start-Up and Shutdown Sequences

Figure 3-15 and Figure 3-5 display the start-up waveforms at 24-V and 48-V input into a ⅓-Ω constant-resistance load using an electronic load. The board Enable is pulled LOW, by connecting it to PGND, then turning ON the benchtop power supply to the desired input voltage, and then pulling the board Enable HIGH, by disconnecting it from PGND.

GUID-20230830-SS0I-WZQK-JS6C-KHWDQDDLHG43-low.png Figure 3-4 24-VIN Start-Up
GUID-20230830-SS0I-HGFQ-RWNV-2QRSXFZGHDGD-low.png Figure 3-5 48-VIN Start-Up

Figure 3-6 and Figure 3-7 show the shutdown waveforms at 24-V and 48-V input into a ⅓-Ω constant-resistance load using an electronic load. While the benchtop power supply is ON and at the desired input voltage and the board Enable is HIGH, the board Enable is pulled LOW by connecting it to PGND.

GUID-20230830-SS0I-BCJF-MMTM-HK89J2TP0VNZ-low.png Figure 3-6 24-VIN Shutdown
GUID-20230830-SS0I-RRDK-4FQK-3ZT2PH9CTQZ5-low.png Figure 3-7 48-VIN Shutdown