SLVSKV5 November 2026 TAS2785
PRODUCTION DATA
The power sequence between the supply rails can be applied in any order as long as SDZ pin is held low. Once all supplies are stable the SDZ pin can be set high to initialize the part. After a hardware or software reset additional commands to the device should be delayed for at least 1ms to allow the OTP memory to load (see section Section 10).
When PVDDL is internally generated (see Section 9.6.1) it is recommended that the device enters Software Shutdown mode before entering Hardware Shutdown mode. This makes sure that PVDDL pin is discharged using the internal 5kΩ pull down resistor (not present in Hardware Shutdown mode).