11 Revision History
Changes from Revision B (April 2024) to Revision C (August 2025)
- Changed maximum clock frequency specification in the Recommended Operating Conditions sectionGo
- Added maximum INL specification for Max-speed mode in the Electrical Characteristics sectionGo
- Changed minimum CLK period specification in the Timing Requirements, section I and IIGo
- Added CLK_DIV[1:0] synchronization discussion to Clock Operation
sectionGo
- Changed BYTE1 command address field from [3:0] to [4:0] in SPI
Commands table and throughout documentGo
Changes from Revision A (June 2023) to Revision B (April 2024)
- Changed digital input/output voltage max specification in the Absolute Maximum Ratings sectionGo
-
Added full-scale signal FFT plots to the Typical Characteristics
section
Go
- Changed Detailed Design Procedure in the A-Weighting
Filter Design Application sectionGo