10 Revision History
Changes from Revision * (April 2025) to Revision A (January 2026)
- Updated data sheet
status from Advanced Information to
Production Data
Go
- Removed "Will be available in
wettable flank QFN (RUC) package"Go
- Updated CMTI minimum to 1kV/µsGo
- Updated Figure 6-5 to
remove isolation barrierGo
- Added Figure 7-2
Go
| DATE |
REVISION |
NOTES |
|
April 2025
|
* |
Initial Release |
Changes from , to , (from Revision () to Revision ())