SLLSEV7E August 2016 – March 2023 TUSB546-DCI
PRODUCTION DATA
Figure 7-1 Power-Up Timing| PARAMETER | MIN | MAX | UNIT | |
|---|---|---|---|---|
| td_pg | VCC (minimum) to Internal Power Good asserted high | 500 | µs | |
| tcfg_su | CFG(1) pins setup(2) | 50 | µs | |
| tcfg_hd | CFG(1) pins hold | 10 | µs | |
| tCTL_DB | CTL[1:0] and FLIP pin debounce | 16 | ms | |
| tVCC_RAMP | VCC supply ramp requirement | 100 | ms |