10 Revision History
Changes from Revision H (May 2022) to Revision I (August 2026)
- Updated the certification information in the Features and
throughout the documentGo
- Updated the number formatting for tables, figures,
and cross-references throughout the
documentGo
- Added maximum impulse voltage (VIMP) parameter per IEC 60747-17. VIMP value is 7692 VPK for 8-DWV package and 5000 VPK for 8-D package.Go
- Changed VIOSM value From: 6250 VPK To: 10000 VPK for 8-DWV package and From: 5000 VPK To: 6500 VPK for 8-D package per IEC 60747-17Go
- Updated Insulation Lifetime Projection Data image and the
Insulation Lifetime sectionGo
Changes from Revision G (January 2022) to Revision H (May 2022)
- Updated CMTI typical to 150
kV/us and minimum to 100 kV/us Go
Changes from Revision F (November 2021) to Revision G (January 2022)
- Added missing DWV Insulation
Specification. Go
Changes from Revision E (July 2021) to Revision F (November 2021)
- Added ISO6721RBD to the data sheetGo
Changes from Revision D (April 2021) to Revision E (July 2021)
- Updated Safety-Related
Certifications tableGo
- Updated test conditions in
all Switching Characteristics tablesGo
- Updated Insulation Lifetime Projection Data imageGo
- Updated Power Supply Recommendations document
referencesGo
Changes from Revision C (March 2021) to Revision D (April 2021)
- Updated device status to "Production
Data"Go
Changes from Revision B (January 2021) to Revision C (March 2021)
- Added the Device Support sectionGo
Changes from Revision A (December 2020) to Revision B (January 2021)
- Changed device status to Production DataGo
- Added the Receiving Notification of Documentation Updates sectionGo
- Changed the Electrostatic Discharge Caution statement Go
Changes from Revision * (July 2020) to Revision A (December 2020)