SLUUD09 April   2024 BQ25308

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  7. 2Hardware
    1. 2.1 I/O Descriptions
    2. 2.2 Equipment
    3. 2.3 Equipment Setup
  8. 3Implementation Results
    1. 3.1 Test Setup and Results
      1. 3.1.1 Test Procedure
        1. 3.1.1.1 Initial Settings
        2. 3.1.1.2 Precharge Mode Verification
        3. 3.1.1.3 Fast Charge Mode Verification
        4. 3.1.1.4 Battery Temperature Monitoring Verification
        5. 3.1.1.5 Helpful Tips
  9. 4Hardware Design Files
    1. 4.1 Schematic
    2. 4.2 PCB Layout
      1. 4.2.1 Board Layout
    3. 4.3 Bill of Materials
  10. 5Additional Information
    1. 5.1 Trademarks

Initial Settings

Use the following steps to enable the BQ25308 EVM test setup:

  1. Make sure Section 2.3 steps have been followed.
  2. Turn on PS1.
    • Measure→ VPMID (PMID-TP2 and PGND-TP10) = 5.00V ± 0.3V.
    • Completely disconnect PS1 from J2 if different voltage value is seen on PMID.
      Note: Completely disconnect Load #1 from BATTERY connections if different value is seen.