SLVAFJ1 February   2023 TPS2121

 

  1.   Abstract
  2.   Trademarks
  3. 1Introduction
    1. 1.1 Design Example Specification
  4. 2Design Considerations
    1. 2.1 Highest Voltage Operation Scheme (VCOMP)
    2. 2.2 Output Voltage Dip and Switchover
    3. 2.3 Overvoltage Calculation
  5. 3Test Results
    1. 3.1 Seamless Switchover from Main Power (IN1) to Backup Power (IN2)
    2. 3.2 Seamless Switchover from Backup Power (IN2) to Main Power (IN1)
  6. 4Summary
  7. 5References

Design Considerations