SLVSHH5C August 2023 – May 2026 TPS25983
PRODUCTION DATA
When the load draws current during the turn-on sequence, there is additional power dissipated. Considering a resistive load during start-up RL(SU), load current ramps up proportionally with increase in output voltage during TdVdt time. Equation 17 shows the average power dissipation in the internal FET during charging time due to resistive load.
Equation 18 gives the total power dissipated in the device during start-up.
The power dissipation, with and without load, for selected start-up time must not exceed the start-up thermal shutdown limits as shown in Thermal Shutdown Plot During Start-up.
For the design example under discussion, the output voltage has to be ramped up in 20ms, which mandates a slew-rate of 0.6V/ms for a 12V rail.
The required CdVdt capacitance on dVdt pin to set 0.6V/ms slew rate can be calculated using Equation 19.
The dVdt capacitor is subjected to typically VIN + 4V during startup. The high voltage bias leads to a drop in the effective capacitor value. So, it is suggested to select 20% higher than the calculated value, which gives 9.2nF. Select the closest 10% standard value: 10nF
The 10nF CdVdt capacitance sets a slew-rate of 0.46V/ms and output ramp time TdVdt of 26ms.
The inrush current drawn by the load capacitance COUT during ramp-up can be calculated using Equation 20.
The inrush power dissipation can be calculated using Equation 21.
For 3.9W of power loss, the thermal shutdown time of the device must be greater than the ramp-up time TdVdt to establish a successful start-up. Figure 8-2 shows the start-up thermal shutdown limit. For 3.9W of power, the shutdown time is approximately 100ms. So it is safe to use 26ms as the start-up time without any load on the output.
The additional power dissipation when a 10Ω load is present during start-up is calculated using Equation 22.
The total device power dissipation during start-up can be calculated using Equation 23.
From Figure 8-2, the thermal shutdown time for 6.3W is approximately 40ms. It is safe to have 30% margin to allow for variation of system parameters such as load, component tolerance, and input voltage. So it is well within acceptable limits to use the 10nF for CdVdt capacitor with start-up load of 10Ω.
When COUT is large, there is a need to decrease the power dissipation during start-up. This can be done by increasing the value of the CdVdt capacitor. A spreadsheet tool TPS25983xx Design Calculator available on the web can be used for iterative calculations.