SLVUBW6A May   2020  – December 2020 TPS61288

 

  1.   Trademarks
  2. 1Introduction
    1. 1.1 Performance Specification
    2. 1.2 Modification
  3. 2Connector, Test Point and Jumper Descriptions
    1. 2.1 Connector and Test Point Descriptions
    2. 2.2 Jumper Configuration
      1.      JP1 (VIN Control)
      2. 2.2.1 JP2 (Enable)
  4. 3Schematic, Bill of Materials, and Board Layout
    1. 3.1 Schematic
    2. 3.2 Bill of Materials
    3. 3.3 Board Layout
  5. 4Revision History

Connector and Test Point Descriptions

This EVM includes I/O connectors and test points as shown in Table 2-1. The power supply must be connected to input connectors, J1 and J2. The load must be connected to output connectors, J3 and J4.

Table 2-1 Connectors and Test Points
Reference Designator Description
J1 Input voltage positive connection
J2 Input voltage return connection
J3 Output voltage positive connection
J4 Output voltage return connection
TP1 VIN_S+ is for positive input voltage sensing
TP2 VIN_S- is for negative input voltage sensing
TP3 VO_S+ is for positive output voltage sensing
TP4 VO_S- is for negative output voltage sensing
TP5 Bode+ is for bode plot measurement connection
TP6 Bode- is for bode plot measurement connection
TP7 Test point to measure SW pin waveform