SLVUDK4 December   2025

 

  1.   1
  2.   Description
  3.   Features
  4.   4
  5. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  6. 2Hardware
    1. 2.1 Safety Instructions
    2. 2.2 Header Information
    3. 2.3 Jumper Information
    4. 2.4 Interfaces
    5. 2.5 Test Points
  7. 3Software
  8. 4Implementation Results
    1. 4.1 Evaluation Setup
      1. 4.1.1 Ripple Measurement Setup
      2. 4.1.2 Loop Response Measurement
      3. 4.1.3 Precise Turn-on Voltage
    2. 4.2 Performance Data and Results
  9. 5Hardware Design Files
    1. 5.1 Schematics
    2. 5.2 PCB Layouts
    3. 5.3 Bill of Materials (BOM)
  10. 6Additional Information
    1. 6.1 Trademarks

Test Points

TP1/2 – VOSNS/GOSNSRegulated output voltage connections. Measure the output voltage regulation at this point.
TP3/4 – VIN/GND S+/S–Input voltage sense connections. Measure the input voltage at this point.
TP5/6 – VOUT/GND S+/S–Output voltage sense connections for efficiency measurements. Measure the output voltage at this point when calculating efficiency.
TP7 – SYNC_OUT1The SYNC_OUT signal of the first device appears at this point. This test point is not installed.
TP8 – SW1SW1 node test point. Measure the SW1 node at this point. This test point is not installed.
TP9 – SW2SW2 node test point. Measure the SW2 node at this point. This test point is not installed.