SLVUE00 October   2026

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 Power Requirements
    2. 2.2 Setup
    3. 2.3 Interfaces
  9. 3Software
    1. 3.1 Software Description
    2. 3.2 Software Installation
    3. 3.3 Programming Options
  10. 4Implementation Results
    1. 4.1 Performance Data and Results
  11. 5Hardware Design Files
    1. 5.1 Schematics
    2. 5.2 PCB Layouts
    3. 5.3 Bill of Materials (BOM)
  12. 6Additional Information
    1. 6.1 Trademarks
    2. 6.2 Terminology

Power Requirements

Either the 5V turret or the USB-C connector in Figure 2-1 supply power to the DP83CX-EVMs. On-board LDOs generate the voltages required for operating various sections of the EVM. Alternatively, external power can be supplied to individual voltage rails.

DP83CX-M-EVM DP83CX EVM Power HeadersFigure 2-1 DP83CX EVM Power Headers
Note:

Before supplying power at the 5V input or USB-C, add the correct shunts to J6, J10, and J11 to properly operate the on-board LDOs.