SLLSFX8 February   2024 TUSB211A-Q1

PRODUCTION DATA  

  1.   1
  2. Features
  3. Applications
  4. Description
  5. Pin Configuration and Functions
  6. Specifications
    1. 5.1 Absolute Maximum Ratings
    2. 5.2 ESD Ratings
    3. 5.3 Recommended Operating Conditions
    4. 5.4 Thermal Information
    5. 5.5 Electrical Characteristics
    6. 5.6 Switching Characteristics
    7. 5.7 Timing Requirements
    8. 5.8 Typical Characteristics
  7. Detailed Description
    1. 6.1 Overview
    2. 6.2 Functional Block Diagram
    3. 6.3 Feature Description
      1. 6.3.1 High-Speed EQ
    4. 6.4 Device Functional Modes
      1. 6.4.1 Low-Speed (LS) Mode
      2. 6.4.2 Full-Speed (FS) Mode
      3. 6.4.3 High-Speed (HS) Mode
      4. 6.4.4 High-Speed Downstream Port Electrical Compliance Test Mode
      5. 6.4.5 Shutdown Mode
  8. Application and Implementation
    1. 7.1 Application Information
    2. 7.2 Typical Application
      1. 7.2.1 Design Requirements
      2. 7.2.2 Detailed Design Procedure
        1. 7.2.2.1 Test Procedure to Construct USB High-Speed Eye Diagram
          1. 7.2.2.1.1 For a Host Side Application
          2. 7.2.2.1.2 For a Device Side Application
      3. 7.2.3 Application Curves
    3. 7.3 Power Supply Recommendations
    4. 7.4 Layout
      1. 7.4.1 Layout Guidelines
      2. 7.4.2 Layout Example
  9. Device and Documentation Support
    1. 8.1 Receiving Notification of Documentation Updates
    2. 8.2 Support Resources
    3. 8.3 Trademarks
    4. 8.4 Electrostatic Discharge Caution
    5. 8.5 Glossary
  10. Revision History
  11. 10Mechanical, Packaging, and Orderable Information

Package Options

Refer to the PDF data sheet for device specific package drawings

Mechanical Data (Package|Pins)
  • RWB|12
Thermal pad, mechanical data (Package|Pins)
Orderable Information

Application Curves

GUID-42935026-67B0-4014-9589-6916499958B4-low.gif Figure 7-2 Near End Eye Measurement Set-Up With Pre-Channel Cable
GUID-7DA339C2-3B13-4B3D-A75B-4017C595C54B-low.pngFigure 7-3 2 Meter Pre-Channel Without TUSB211A-Q1
GUID-BD935293-877D-4A41-B3FC-D482FA3B3D87-low.pngFigure 7-5 5 Meter Without TUSB211A-Q1
GUID-DC71C13C-CAC2-452D-AEF6-AE6EB5DF9EB6-low.pngFigure 7-7 5 Meter Pre-Channel With TUSB211A-Q1 EQ=2
GUID-73A2302D-1858-4439-BE01-03CBAF5E3929-low.pngFigure 7-4 2 Meter Pre-Channel With TUSB211A-Q1 EQ=1
GUID-74B3BE6F-1711-4754-9A37-9B4052BF6A43-low.pngFigure 7-6 5 Meter Pre-Channel With TUSB211A-Q1 EQ=1
GUID-AA704C29-B2D9-4CA2-95CD-9E06AFA0A0B0-low.gif Figure 7-8 Near End Eye Measurement Set-Up With Post-Channel Cable
GUID-528BE490-5927-45B5-9F4C-E70458AD23E7-low.pngFigure 7-9 1 Meter Post-Channel Without TUSB211A-Q1
GUID-1F833079-B710-49B7-B422-DB20284EF02B-low.pngFigure 7-11 2 Meter Post-Channel Without TUSB211A-Q1
GUID-B026D8E3-209B-4886-9A44-72A505156B90-low.pngFigure 7-13 4 Meter Post-Channel Without TUSB211A-Q1
GUID-8A5B9148-9355-43E0-BCAC-4B81E419304D-low.pngFigure 7-10 1 Meter Post-Channel With TUSB211A-Q1 EQ=0
GUID-91EAD0E6-3509-4465-95DC-55FA9C3CD941-low.pngFigure 7-12 2 Meter Post-Channel With TUSB211A-Q1 EQ=1
GUID-B207137E-6A3C-4A5D-B9DE-64AFAF441484-low.pngFigure 7-14 4 Meter Post-Channel With TUSB211A-Q1 EQ=2