See Timing
Diagrams for tr and tf specifications and
conditions.
Figure 5-3 SCP Requirements for Rise and
Fall
For output timing analysis, the
tester pin electronics and its transmission line effects must be taken into
account. System designers use IBIS or other simulation tools to correlate the
timing reference load to a system environment.
Figure 5-4 Test Load Circuit for Output
Propagation Measurement