SLVSH27B April 2023 – December 2025 ESD451
PRODUCTION DATA
Refer to the PDF data sheet for device specific package drawings
Changes from Revision A (June 2023) to Revision B (December 2025)
Changes from Revision * (April 2023) to Revision A (June 2023)