10 Revision History
Changes from Revision B (April 2024) to Revision C (August 2025)
- Updated the number formatting for tables, figures,
and cross-references throughout the
documentGo
- Updated Transient Isolation Voltage for REU-8 package to 2000Vrms(AC) and 2828V(DC)Go
- Updated Transient Isolation Voltage for 8D package to 2000Vrms(AC) and 2828V(DCGo
- VIOWM AC Voltage updated for REU-8 package variantGo
- VIOWM DC Voltage updated for REU-8 package variantGo
- Updated Insulation Lifetime Projection Data imageGo
- Updated Power Supply Recommendations document
referencesGo
Changes from Revision A (December 2023) to Revision B (April 2024)
- Updated the number formatting for tables, figures,
and cross-references throughout the
documentGo
- Added information about the ISO6521F variant
throughout the document Go
Changes from Revision * (August 2023) to Revision A (December 2023)
- Updated device status to Production DataGo
- Updated Typical Application DiagramGo