DLPU105A March   2021  – October 2025 DLP471TP , DLPC6540

PRODUCTION DATA  

  1.   1
  2.   DLP®LightCrafter™ Display 471TP EVM Overview
  3.   Trademarks
  4.   4
  5. 1Safety Instructions
  6. 2Applicable Documents
  7. 3DLP LightCrafter Display 471TP EVM Components
  8. 4Light Engine
  9. 5Quick-Start Procedure
  10. 6Circuit Description
    1. 6.1 Connectors and Switches on Formatter Board
    2. 6.2 Connectors on Front-End Board
  11. 7EVM Setup
  12. 8Notifications
  13. 9Revision History

DLP LightCrafter Display 471TP EVM Components

The DLP LightCrafter Display module consists of three subsystems:

  • Light engine – Includes the optics, red, green, and blue LEDs, DMD interface board, and a DLP471TP 4K UHD DMD capable of over 500 lumens out-of-the-box.
  • Formatter Board – Includes the DLP chipset comprised of a DLPC6540 controller and DLPA3005 PMIC/LED driver, USB, and power connector.
  • Front-End Board – Includes the HDMI receiver and external HDMI connector.
DLPC6540, DLP471TP DLP LightCrafter Display EVM Block DiagramFigure 3-1 DLP LightCrafter Display EVM Block Diagram