SBAU432A
December 2023 – May 2025
AFE7728D
,
AFE7768D
,
AFE7769D
Abstract
2
Trademarks
1
Introduction
2
Basic EVM Test Procedures
2.1
Safety
2.2
Quality
2.3
Apparel
2.4
Hardware and Software Requirements
2.4.1
Test Equipment Required
2.4.2
Software Required
3
AFE7769DEVM Setup
3.1
AFE7769D Hardware Changes
3.2
AFE7769D Connections
3.3
AFE7769D Software Setup
3.4
AFE7769D Programming Method 1: Automated
3.5
AFE7769D Programming Method 2: Using GUI Mode
4
Revision History
3.2
AFE7769D Connections
Connect the 5.5V power supply to power jack connector (J22) of the AFE7769DEVM.
Check and make sure the D14 (POWER) LED lights up.
Connect the USB Type Mini-B Cable from PC to the USB port (J20) of the AFE7769DEVM.
Check and make sure the D13 (USB_PWR) LED lights up.
Connect the AFE7769DEVM to the RNS802 through the FMC connector.
Connect the 122.88MHz reference clock (SYNC_CLOCK) from the RNS802 (J1106) to the LMK_CLKIN (J19) of the AFE7769DEVM, as shown in
Figure 3-2
.
Figure 3-2
Hardware Setup and Connections AFE7769DEVM-RNS802