SBAU432A December   2023  – May 2025 AFE7728D , AFE7768D , AFE7769D

 

  1.   Abstract
  2.   2
  3.   Trademarks
  4. 1Introduction
  5. 2Basic EVM Test Procedures
    1. 2.1 Safety
    2. 2.2 Quality
    3. 2.3 Apparel
    4. 2.4 Hardware and Software Requirements
      1. 2.4.1 Test Equipment Required
      2. 2.4.2 Software Required
  6. 3AFE7769DEVM Setup
    1. 3.1 AFE7769D Hardware Changes
    2. 3.2 AFE7769D Connections
    3. 3.3 AFE7769D Software Setup
    4. 3.4 AFE7769D Programming Method 1: Automated
    5. 3.5 AFE7769D Programming Method 2: Using GUI Mode
  7. 4Revision History

AFE7769D Hardware Changes

Make the following changes to the AFE7769DEVM to separate the SYNCOUT pins as shown in Figure 3-1.

 Separating the SYNCOUT PinsFigure 3-1 Separating the SYNCOUT Pins

In conjunction to the schematic, see Table 3-1 for the list of switches to make.

Table 3-1 List of Pin Changes, AFE7769DEVM
AFE Reference DesignatorChange FromChange To
R16DNI
R19DNI
R3DNI
R5DNI
R1DNI
R2DNI
R21DNI
R22DNI