SDAA486 September 2026 CC1312R
All smart flow meters also have a pre-defined runtime in the field, often varying between five to ten years and in some markets even longer, after which the meters must be replaced. Any smart meter must provide some form of metrologically controlled display with billing relevant user consumption data. For the EU, this is regulated in the MID 2014/32/EU (Annex I, Essential Requirements) document, stating the display requirements can be met by variety of options. These can be mechanical counters (as in legacy mechanical water meters world-wide), Liquid crystal displays (LCDs) in electronic flow meters, light-emitting diodes (LEDs), or other electronic displays, provided they meet the criteria of the directive for readability, non-ambiguity, and security.
The segment LCD displays are by far the dominant technology in smart flow meters and heat cost allocators. Regulations in the EU do allow us to have the LCD display switched off, but in such case end users must have the possibility to activate it instantly on demand, typically implemented with the help of either a push or capacitive touch button, an optical sensor for lid opening or another user-initiated prompt.