SLUUCV8A October   2023  – June 2025 TPS4810-Q1

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  7. 2Hardware
    1. 2.1 Overview
    2. 2.2 General Configurations
      1. 2.2.1 Physical Access
      2. 2.2.2 Test Equipment and Setup
  8. 3Implementation Results
    1. 3.1 Test Setup and Procedures
      1. 3.1.1 Power-up with EN Control
      2. 3.1.2 Overload and Short Circuit Protection Test
      3. 3.1.3 Short-Circuit Protection Diagnosis Test
      4. 3.1.4 Input Reverse Polarity Test
  9. 4Hardware Design Files
    1. 4.1 Schematic
    2. 4.2 PCB Layout
    3. 4.3 Bill Of Materials (BoM)
  10. 5Additional Information
    1.     Trademarks
  11. 6Revision History

Test Equipment and Setup

  • Power Supplies - One adjustable power supply with 0-V to 60V- output and 0-A to 50-A output current limit

  • Meters - One DMM minimum needed

  • Oscilloscope - A DPO2024 or equivalent, three 10 times voltage probes, and a DC current probe

  • Loads - One resistive load or equivalent that can tolerate up to 50-A DC load at 60 V and capable of the output short