SLVSGH7C November 2022 – May 2024 DRV8410
PRODUCTION DATA
There is no specific sequence for powering up the DRV8410. The presence of digital input signals is acceptable before VM is applied. After VM is applied to the DRV8410, the device begins operation based on the status of the control pins.