SLVT239 March   2026

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6. 1Test Prerequisites
    1. 1.1 Key System Specifications
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Test Setup
    5. 1.5 Power Up Procedure
  7. 2Testing and Results
    1. 2.1 Efficiency Graph
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
  8. 3Waveforms
    1. 3.1 Start-up Waveform
    2. 3.2 Input Current Waveform
    3. 3.3 AC Drop Test
    4. 3.4 Fly Cap Voltage Balancing
    5. 3.5 E-Meter Performance
    6. 3.6 References

E-Meter Performance

PMP41166 E-Meter Graph at 115VACFigure 3-6 E-Meter Graph at 115VAC
PMP41166 E-Meter Graph at 230VACFigure 3-7 E-Meter Graph at 230VAC
PMP41166 E-Meter Graph at 240VDCFigure 3-8 E-Meter Graph at 240VDC