SLVUBO4B March   2019  – September 2021 TPS55288

 

  1.   Trademarks
  2. 1Introduction
    1. 1.1 Performance Specification
    2. 1.2 Modification
      1. 1.2.1 Modification
  3. 2Connector, Test Point, and Jumper Descriptions
    1. 2.1 Connector and Test Point Descriptions
    2. 2.2 Jumper Configuration
      1. 2.2.1 JP1 (ENABLE)
      2. 2.2.2 JP2 and JP3 (External Feedback and Internal Feedback Selection)
      3. 2.2.3 JP4 (SYNC)
  4. 3Test Procedure
  5. 4Software User Interface
    1. 4.1 Install USB2ANY Explorer
    2. 4.2 GUI Installation
    3. 4.3 Interface Hardware Setup
    4. 4.4 User Interface Operation
    5. 4.5 Register Map Screen
  6. 5Schematic, Bill of Materials, and Board Layout
    1. 5.1 Schematic
    2. 5.2 Bill of Materials
    3. 5.3 Board Layout
  7. 6Revision History

Revision History

Changes from Revision A (August 2020) to Revision B (September 2021)

  • Updated schematic layout.Go
  • Updated Bill of Materials.Go

Changes from Revision * (February 2020) to Revision A (August 2020)

  • Updated TPS55288EVM-045 Inner Layer 2 imageGo
  • Updated TPS55288EVM-045 Bottom-Side Layout imageGo