6 Revision History
Changes from Revision A (July 2025) to Revision B (October 2025)
- Changed BOM, schematic, PCB layout, and hardware description
sections to accommodate revision B of the EVM hardwareGo
Changes from Revision * (July 2025) to Revision A (August 2025)
- Updated maximum load capacitance, maximum output current, and the maximum supply
voltageGo
- Changed maximum supply voltageGo