SPRSPB1A October 2025 – January 2026 F28377D-SEP
PRODUCTION DATA
| PARAMETER | MIN | MAX | UNIT | |
|---|---|---|---|---|
| td(INT) | Delay time, INT low/high to interrupt-vector fetch(2) | tw(IQSW) + 14tc(SYSCLK) | tw(IQSW) + tw(SP) + 14tc(SYSCLK) | cycles |
Figure 6-21 External Interrupt Timing