Programming sequence for OTP eFuses:
- Power on the board per the
power-up sequencing. No voltage should be applied on the VPP terminal during
power up and normal operation.
- Load the OTP write software
required to program the eFuse (contact your local TI representative for the
OTP software package).
- Apply the voltage on the VPP
terminal according to the specification in Section 6.7.1.
- Run the software that
programs the OTP registers.
- After validating the content
of the OTP registers, remove the voltage from the VPP terminal.