PRODUCTION DATA
In many different applications, the power-supply output must turn-on within a specific window of time because of sequencing requirements, providing proper operation of the load, or to minimize the loading on the input supply.
Both LDOs start-up are well-controlled and user-adjustable through the CNR/SS capacitor, solving the demanding requirements faced by many power-supply design engineers in a simple fashion. For start-up tracking to work correctly. a minimum 4.7nF CNR/SS capacitor is required. For more information on start-up tracking, see the Noise-Reduction and Soft-Start Capacitor (CNR/SS) section.