5 Revision History
Changes from Revision A (April 2025) to Revision B (May 2026)
- Updated the EVM image to revision C board
(AMPS251C)Go
- Updated text regarding change in default EP and EN configuration to 100Ω
differential LVDS input Go
- Corrected the default R21 value to 2ΩGo
- Updated Figure 3-1, LMH13000RQEEVM Schematic for Revision C
board (AMPS251C) and updated note informing the change in the C2 and R22 DNI
status. Also added note regarding the default value of snubber's
componentsGo
- Updated DNI status of the C2 and R22 in Table 3-1, Bill of
Materials
Go
Changes from Revision * (February 2025) to Revision A (April 2025)
- Updated continuous current capability value in Introduction and Device
Information sectionsGo
- Updated text for J_PD_SEL and J_RBIAS_CTRL in Jumper
Information
Go
- Updated installed snubber R and C values Go
- Updated Figure 3-2 to Figure 3-5Go