SLUUC44A July 2019 – December 2022
To operate the EVM, set jumpers JP1, JP2, and JP3 to the desired positions per Rev.A - Connector Descriptions. Connect the input supply to J1, between VIN and GND, and connect the load to J2 between VOUT and GND.